Product Storage
Store product in an area as to bring the material to normal room temperature before using. Continuous storage should be between 60 and 90 degrees F.
Surface Preparation
Surface preparation will vary according to the type of complete system to be applied. For a one or two coat thin build system (3-10 mils dry) we recommend either mechanical scarification or acid etching until a suitable profile is achieved. For a complete system build higher than 10 mils dry, we recommend a fine brush blast (shot blast). All dirt, oil, dust, foreign contaminants and laitance must be removed to assure a trouble free bond to the substrate. A test should be made to determine that the concrete is dry; this can be done by placing a 4’X4’ plastic sheet on the substrate and taping down the edges. If after 24 hours, the substrate is still dry below the plastic sheet, then the substrate is dry enough to start coating. The plastic sheet testing is also a good method to determine if any hydrostatic pressure problems exist that may later cause disbonding.
Product Mixings
This product has a mix ratio of 9.95# part A to 4.15# part B by weight. Merely mix the two components together. After the two parts are combined, mix well with slow speed mixing equipment such as jiffy mixer until the material is thoroughly mixed and streak free
Product Priming
Product Application
The mixed material can be applied by brush or roller. Maintain temperatures and humidity within the recommended ranges during the application and curing process. Improper mixing or applying the product too thick can result in product failure.
Recoating or Topcoating
The mixed material can be applied by brush or roller. Maintain temperatures and humidity within the recommended ranges during the application and curing process. Improper mixing or applying the product too thick can result in product failure.
Cleanup
The mixed material can be applied by brush or roller. Maintain temperatures and humidity within the recommended ranges during the application and curing process. Improper mixing or applying the product too thick can result in product failure.
Floor Cleaning
The mixed material can be applied by brush or roller. Maintain temperatures and humidity within the recommended ranges during the application and curing process. Improper mixing or applying the product too thick can result in product failure.
DISCLAIMER OF WARRANTIES AND LIMITATIONS ON OUR LIABILITY

Epoxy Training

Concrete Patchwork 101Epoxy Preparation using our one-to-one mixing material that can be found on our epoxysolids.com website.Posted 2 years ago

Tooling 101Epoxy Flooring "Tooling" is important. Our Contractors Kit is available for our professional epoxy installations.Posted 2 years ago

Epoxy Mix areaPreparationPosted 2 years ago

Mixing 101Clear EpoxyPosted 2 years ago

Squeegee 101Epoxy FlooringPosted 2 years ago

Rolling Red EpoxyFirst CoatPosted 2 years ago

Scrapping ChipsPolymer Flake SystemPosted 2 years ago